Ardley Energy from Waste Facility

Ardley Energy from Waste Facility


Oxfordshire

 

Market Sector: Energy

Client: Viridor

Engineer: TATA

Main Contractor: Clugston

Ardley Energy from Waste (EfW) facility has been constructed for Oxfordshire County Council and has the capacity to generate 24mw of renewable energy for the National Grid.

Ardley is Bourne’s fourth EfW project and the second awarded by Viridor, following Exeter EfW. The main works included delivering the super structure to support the structural steel for both the envelope, and cranes in the bunker. As part of the requirements for these structures the crane steelwork had to meet execution class 3 for welding standards.