International retailer, Marks and Spencer plc extended their Plymouth store by demolishing a section of the existing structure and constructing four new floors and a plant room. The extra space gave the store a new cutting edge design with free-flow walkways.
We supplied and installed the structural steelwork, decking and on-site intumescent paint to achieve this stylish shopping space.
It was essential that the store continued trading throughout the entire construction period and in order to achieve this we frequently worked outside of store opening hours. With the building situated in the heart of the lively city centre, project deliveries had to be planned very carefully.