Shepperton South MSCP


Surrey

 

Market Sector: Commercial

Client: Pinewood Group

Main Contractor: Laing O'Rourke

Spaces: 705

Bourne Parking were appointed by Laing O’Rourke to provide a new multi-storey car park system at Shepperton South Studios.

The Pinewood Group are expanding the existing Shepperton Studios production hub with new
production offices, sound stages and workshops to be used by Netflix.

The multi-storey car park will provide much needed car park capacity with 705 parking spaces on
ground floor and six suspended parking decks. The car park design is based upon a traditional flat deck parking layout with a large central two-way ramp.

Bourne Parking are responsible for the turn-key above ground scope which includes; Montex structural frame, vehicle crash barriers and edge restraint system, above ground drainage, asphalt
waterproofing, line marking, signage, precast concrete stair cores,