16-Sept-2016: Bourne Steel among top 10 best performing subcontractors at 58 Victoria Embankment


bourne-london

Bourne Steel have been included in the ‘Top 10 Best Performing Subcontractors’ in the Kier Construction London BRAG score review, with an overall score of 90% on the 58 Victoria Embankment project.

Subcontractors were scored on ten areas of performance, including; quality of workmanship, adherence to programme and health & safety management, all of which Bourne Steel scored nine out of a maximum of 10 points.

Kier’s Mark Fox has said “This is a fantastic achievement and we would like you to pass on our thanks to the team, and congratulate them on their efforts.”