Farringdon Station

Farringdon Station, Integrated Ticket Hall


London

 

Market Sector: Rail

Client: Network Rail

Engineer: Atkins

Main Contractor: Costain/Laing O'Rourke

The redevelopment of Farringdon station was part of the ThamesLink programme. The Bourne Group delivered the station’s new integrated ticket hall that included under pinning the existing bridge, refurbishing Turnmill Street ticket hall, and installing new roof lights.

The package included the supply and installation of cladding, glazing and louvers; the refurbishment of the existing Grade II listed station building and construction of the new north train shed roof (featured separately).

The structural steel package delivered to Farringdon earned the Bourne Group the 2012 Construction News Steel Specialist Award and was also shortlisted at the Structural Steel Design Awards.