In order to cope with increasing passenger numbers using the new High Speed 1 Channel Tunnel Rail Link, Bourne Parking was contracted to supply the full turnkey Design and Build of a new multi storey car parking facility at Stratford’s International rail interchange. The 850 space multi storey car park comprises of six suspended parking levels and incorporates an architectural Fin cladding system.
Bourne Parking delivered the substructure package, which included excavation, split line retaining walls, piled foundations, below ground drainage and ground level parking wearing course. The superstructure incorporates a galvanised steel frame, Bourne Parking’s Montex flooring technology and our Bourne Barrier crash barrier system. To assist with speeding up the construction programme, precast concrete stair and lift cores were utilised within the design.